Terms of website use
Introduction
These Terms of Website Use govern your use of azre.co.uk (“the Website”). By accessing or using the Website, you agree to be bound by these Terms. If you do not agree, you must not use the Website.
AZ Renewable Energy Ltd (“AZRE”, “we”, “our”, “us”)
Email: support@azre.co.uk
These Terms are separate from our Terms & Conditions of Sale, which apply to purchases made through the Website.
Access to the Website
We aim to ensure the Website is available at all times, but we do not guarantee uninterrupted or error‑free access. We may suspend, withdraw, or change any part of the Website without notice.
We are not liable if the Website is unavailable for any period.
Use of the Website
You agree to use the Website only for lawful purposes and not to:
- Breach any applicable law or regulation
- Interfere with or disrupt the Website or its security
- Attempt to gain unauthorised access to any part of the Website, server, or connected systems
- Introduce viruses, malware, or other harmful material
Intellectual property
All content on the Website, including text, images, logos, graphics, and layout, is owned by or licensed to AZRE and is protected by copyright and other intellectual property laws.
You may:
- View pages on the Website
- Print or download extracts for personal, non‑commercial use
You must not:
- Reproduce, distribute, or modify any content without our prior written consent
- Use any content for commercial purposes without permission
Information on the Website
We make reasonable efforts to ensure that information on the Website is accurate and up to date. However:
- Content is provided for general information only
- It does not constitute professional advice
- We do not guarantee that the information is complete, accurate, or current
- You should obtain professional or specialist advice before taking action based on Website content.
Links to other websites
The Website may contain links to third‑party websites. These links are provided for convenience only. We have no control over, and are not responsible for, the content or policies of those websites.Limitation of liability
To the fullest extent permitted by law, we are not liable for:
- Loss of profit, revenue, or business
- Loss of data
- Indirect or consequential loss or damage
- Any loss arising from your use of, or inability to use, the Website
Nothing in these Terms excludes or limits liability for death or personal injury caused by negligence, fraud, or any other liability that cannot be excluded under UK law.
Privacy and cookies
Your use of the Website is also governed by our:
- Privacy Policy
- Cookie Policy
Please read these documents carefully.
Changes to these Terms
We may update these Terms from time to time. Any changes will be posted on this page with an updated “last updated” date. Continued use of the Website after changes are posted constitutes acceptance of the revised Terms.Governing law
These Terms are governed by the laws of England and Wales. Any disputes arising in connection with these Terms or the Website will be subject to the exclusive jurisdiction of the courts of England and Wales.
Terms and conditions of sale
1.Introduction
-
Eligibility to Purchase
-
Product Information
-
Pricing and Payment
- All prices are in GBP and include VAT where applicable.
- Payment must be received in full before dispatch.
- We accept payments through secure gateways including Lloyds Cardnet.
- If a pricing error occurs, we may cancel or amend the order before dispatch.
-
Order Process
- You receive an order confirmation email
- We review and accept the order
- We dispatch the goods and send a dispatch confirmation
-
Delivery
6.1 Delivery Time
Standard delivery for biomass boilers and heat pumps is 2–3 weeks from order confirmation. Delivery times are estimates and may vary due to:- Stock availability
- Manufacturer lead times
- Customs processing
- Seasonal demand
- Delivery location
6.2 Delivery Method
Due to the size and weight of our products, delivery is carried out using:- A lorry or large van
- Planned transportation slots
- Professional loading and unloading services
- Palletised transport
- Tail‑lift or forklift unloading (where appropriate)
- Placement of the pallet at a safe, accessible point on your property
6.3 Customer Responsibilities
You must ensure:- Suitable access for a large delivery vehicle
- A safe, level, unobstructed area for unloading
- Any required permissions for restricted access zones
6.4 Customs and Import Handling
For imported products:- AZRE can organise customs clearance and logistics
- All customs duties, taxes, and import fees are payable by us
- These fees are non‑refundable once incurred
-
Inspection, Risk & Ownership
7.1 Inspection on Delivery
In accordance with UK consumer law, you must:- Inspect the goods upon delivery
- Report visible damage or missing items within 48 hours
7.2 Risk
Risk passes to you once the goods are delivered to your address.7.3 Ownership
Ownership passes only when full payment has been received.-
Installation Services
- You must provide accurate site information
- You must ensure safe access and working conditions
- Additional charges may apply for unforeseen work or non‑standard installations
-
Warranty
- Assistance with diagnosis
- Replacement of faulty parts
- Labour for repairs or part replacement
- Improper installation (if not installed by AZRE)
- Misuse, neglect, or unauthorised modifications
- Consumables or routine maintenance items
-
Returns, Cancellations & Refunds
10.1 Cancellation Rights
Under the Consumer Contracts Regulations 2013, you may cancel most online purchases within 14 days of delivery.10.2 Exclusions
Cancellation rights do not apply to:- Installed products
- Used or unsealed items
- Special‑order or imported items purchased specifically for you
- Items returned without original packaging
10.3 Faulty Goods
If your item is faulty or not as described: You may be entitled to repair, replacement, or refund under the Consumer Rights Act 2015- You must notify us within 30 days of delivery
-
Liability
- Loss of profit, revenue, or business
- Indirect or consequential losses
- Damage caused by improper installation, misuse, or failure to follow manufacturer guidance
-
Data Protection
-
Governing Law
-
Contact Us
Delivery policy
Introduction
This Delivery Policy explains how biomass boilers, heat pumps, and related renewable energy equipment purchased through azre.co.uk are transported and delivered. It is written in accordance with UK consumer legislation, including the Consumer Rights Act 2015 and the Consumer Contracts Regulations 2013. If you have any questions, please contact info@azre.co.uk.-
Delivery Timeframes
2.1 Standard Delivery
Most biomass boilers and heat pumps are delivered within 2–3 weeks from the date of order confirmation and full payment. Delivery times are estimates and may vary due to:- Manufacturer lead times
- Stock availability
- Customs processing
- Seasonal demand
- Delivery location We will notify you promptly of any significant delays.
-
Delivery Method
- A lorry or large van
- Planned transportation slots
- Professional loading and unloading services
- Palletised transport
- Tail‑lift or forklift unloading (where appropriate)
- Placement of the pallet at a safe, accessible point on your property
- Suitable access for a large delivery vehicle
- A safe, level, and unobstructed area for unloading
- Any required permissions for restricted access zones
-
Delivery Locations
-
Customs and Import Handling
- All customs duties, taxes, and import charges are payable by AZ Renewable Energy Ltd as part of the sales contract with the customer.
- We will provide estimated costs where possible before shipment.
-
Delivery Inspection and Acceptance
- Inspect the goods upon delivery
- Check for visible damage, missing items, or packaging issues
- Report any concerns to the driver and to us within 48 hours
- Risk passes to you once the goods are delivered to your address.
- Ownership passes only when full payment has been received.
-
Failed Delivery Attempts
- No one is available to receive the goods
- Access is restricted or unsafe
- The delivery location is unsuitable for unloading
- Re‑delivery fees may apply
- Storage charges may be incurred
- Delivery will be rescheduled at the next available slot
-
Split Deliveries
- Manufacturer dispatch schedules
- Stock availability
- Transport logistics
-
Installation Coordination
- Delivery and installation may be coordinated together
- Equipment must be delivered before installation can begin
- You must ensure the equipment is stored safely and securely until installation day
-
Delays Outside Our Control
- Customs processing
- Port congestion
- Weather conditions
- Courier or freight delays
- Manufacturer supply chain issues
-
Your Legal Rights
- The Consumer Rights Act 2015
- The Consumer Contracts Regulations 2013
-
Contact Us
3.1 Specialist Transport
Due to the size and weight of our products, deliveries are carried out using:3.2 Customer Responsibilities
You must ensure:5.1 Customs Clearance
AZ Renewable Energy Ltd will organise: Customs documentation Import declarations Coordination with freight forwarders Transport from port to your delivery address Customs Fees6.1 Inspection on Delivery
In accordance with UK consumer law, you must:6.2 Risk and Ownership
Returns, cancellation and refund policy
1. Introduction
This policy explains how returns, cancellations, and refunds are handled for biomass boilers, heat pumps, and related renewable energy products purchased through azre.co.uk.
It is written in accordance with:
• The Consumer Rights Act 2015
• The Consumer Contracts Regulations 2013
• Applicable UK consumer protection legislation
Nothing in this policy affects your statutory rights.
2. Your Right to Cancel (Consumer Contracts Regulations 2013)
2.1 Standard Right to Cancel
For most products purchased online, you have the right to cancel your order within 14 days of receiving the goods (“cooling‑off period”).
To exercise this right, you must notify us in writing:
Email: info@azre.co.uk
2.2 Exclusions to the Right to Cancel
Under UK law, the right to cancel does not apply to:
• Goods made to your specifications or clearly personalised
• Special‑order or imported items purchased specifically for you
• Goods that become mixed inseparably with other items after delivery
• Goods that have been installed
• Goods that have been used, unsealed, or damaged after delivery
• Goods not returned in their original packaging
Biomass boilers and heat pumps are often special‑order, imported, or heavy‑goods items, meaning cancellation rights may be limited once procurement or customs processes begin.
We will always inform you before purchase if your item is considered a special‑order or non‑returnable item.
3. Returns
3.1 Conditions for Return
If your item is eligible for return:
• It must be unused
• It must be in its original packaging
• It must be in resalable condition
• You must return it within 14 days of notifying us
3.2 Return Shipping
For heavy‑goods items such as biomass boilers and heat pumps:
• Returns require palletised transport
• Specialist handling may be required
• Return shipping costs are the responsibility of the customer, unless the item is faulty
We can arrange return transport on your behalf; costs will be deducted from your refund.
4. Faulty or Damaged Goods (Consumer Rights Act 2015)
4.1 Faults Reported Within 30 Days
If your item is faulty, damaged, or not as described:
• You are entitled to a full refund, repair, or replacement
• You must notify us within 30 days of delivery
4.2 Faults Reported After 30 Days
After 30 days, you are entitled to:
• A repair or replacement under the 3‑year manufacturer warranty
• Support from AZRE for diagnosis, replacement parts, and labour
4.3 Damage in Transit
You must inspect the goods upon delivery and report any visible damage within 48 hours.
This is required so we can submit claims to the carrier.
5. Refunds
5.1 Refund Processing
Refunds are issued:
• To the original payment method
• Within 14 days of receiving the returned item
• After inspection confirms the item is in an acceptable condition
5.2 Deductions
We may deduct an amount from your refund if:
• The product has been handled beyond what is necessary to inspect it
• Packaging is missing or damaged
• Return transport costs apply
• Customs or import fees have already been incurred
5.3 Delivery Charges
If you cancel within the statutory cooling‑off period:
• Standard delivery charges are refundable
• Premium delivery services (e.g., timed delivery) are not refundable
6. Cancellations Before Dispatch
6.1 Standard Orders
If your order has not yet been dispatched, you may cancel it immediately for a full refund.
6.2 Special‑Order or Imported Items
If procurement, manufacturing, or customs processes have already begun:
• Cancellation may not be possible, or
• Costs already incurred (e.g., customs fees, freight charges) may be deducted from your refund
We will always inform you of any such costs before proceeding.
7. Customs and Import Fees
Where AZRE organises customs clearance:
• All duties, taxes, and import charges are payable by AZ Renewable Energy Ltd
• These fees may be charged separately in certain circumstances. The customer will be notified in advance if this is the case
These fees are non‑refundable once incurred
This complies with UK consumer law regarding non‑recoverable third‑party charges.
8. Installation Service Cancellations
8.1 Cancellation by Customer
• More than 48 hours before the appointment: full refund
• Less than 48 hours: a cancellation fee may apply
8.2 Failed Installation
If the installer attends but cannot proceed due to:
• Inaccurate site information
• Unsafe working conditions
• Missing or inaccessible equipment
A call‑out fee may apply.
9. How to Contact Us
For cancellations, returns, or refund enquiries:
Email: info@azre.co.uk
Phone: +44 020 3432 1809
Address: Office 8561 321-323 High Road, Chadwell Heath, Essex, RM6 6AX
Warranty Policy
1. Introduction
This Warranty Policy explains the warranty coverage for biomass boilers, heat pumps, and related renewable energy equipment purchased through azre.co.uk. It is designed to comply with UK consumer legislation, including the Consumer Rights Act 2015.
This policy does not affect your statutory rights.
Manufacturer Warranty (3 Years)
All biomass boilers and heat pumps supplied by AZ Renewable Energy Ltd (“AZRE”, “we”, “our”) include a 3‑year manufacturer warranty covering:
- Manufacturing defects
- Faulty components
- Premature failure of parts
- System malfunctions caused by manufacturing issues
- The warranty period begins on the date of delivery.
What AZRE Provides Under Warranty
AZRE will support warranty claims by providing:
- Technical assistance and diagnosis
- Replacement of faulty parts supplied under the manufacturer warranty
- Labour for repairs or part replacement
- Liaison with the manufacturer where required
We aim to resolve warranty issues promptly and efficiently.
What the Warranty Does Not Cover
The warranty does not cover:
- Damage caused by improper installation (if not installed by AZRE)
- Damage caused by misuse, neglect, or lack of maintenance
- Damage caused by unauthorised repairs or modifications
- Consumables (e.g., gaskets, seals, filters)
- Normal wear and tear
- Damage caused by external factors (e.g., flooding, freezing, electrical surges)
Customer Responsibilities
To maintain warranty coverage, you must:
- Ensure the product is installed by a qualified and competent installer
- Follow the manufacturer’s maintenance schedule
- Use the product in accordance with the manufacturer’s instructions
- Report faults promptly
- Failure to meet these requirements may invalidate the warranty.
How to Make a Warranty Claim
To make a claim, contact us at: info@azre.co.uk
Please include:
- Order number
- Product details
- Description of the issue
- Photos or videos (if applicable)
We will assess the issue and arrange repair, replacement, or further investigation.
Statutory Rights
Your rights under the Consumer Rights Act 2015 apply in addition to this warranty.
These include:
- 30‑day right to reject faulty goods
- Right to repair or replacement
- Right to a price reduction or final right to reject if repairs fail
Pre-installation requirements
1. Introduction
To ensure safe, compliant, and efficient installation of biomass boilers and heat pumps, customers must meet
the following pre‑installation requirements. These requirements help prevent delays, additional costs, or failed installation visits.
2. Site Access
You must ensure:
- Clear access for installers and equipment
- Safe parking for a van or lorry
- Unobstructed pathways to the installation area
- Adequate lighting and safe working conditions
If access is restricted, additional charges may apply.
3. Installation Area Requirements
The installation area must:
- Be structurally suitable for the weight of the equipment
- Meet ventilation and clearance requirements specified by the manufacturer
- Have adequate space for servicing and maintenance
- Be free from hazards, debris, or obstructions
- For biomass boilers, ensure compliance with flue, chimney, and fuel storage requirements.
4. Electrical and Plumbing
Requirements
Before installation:
- Electrical supply must meet the manufacturer’s specifications
- Plumbing connections must be accessible and in good condition
- Any required upgrades must be completed in advance
- If upgrades are required on the day, additional charges may apply.
5. Fuel Storage (Biomass Boilers
Only)
You must ensure:
- A suitable fuel storage area
- Safe access for fuel delivery
- Compliance with fire safety and ventilation requirements
6. Customer Presence
A responsible adult (18+) must be present during installation to:
- Provide access
- Approve installation location
- Receive handover instructions
7. Failed Installation Visits
If installation cannot proceed due to unmet requirements:
- A call‑out fee may apply
- Installation will be rescheduled once issues are resolved
Customer responsibilities checklist
This checklist helps ensure smooth delivery and installation of your biomass boiler or heat pump.
Before Delivery
- Confirm access for a large van or lorry
- Ensure a safe, level unloading area
- Notify us of any access restrictions
- Prepare for palletised delivery
- Ensure someone is available to receive the goods
Upon Delivery
- Inspect goods for visible damage
- Report issues within 48 hours
- Move equipment to a secure storage area
- Do not unseal or install until ready
Before Installation
- Ensure installation area meets manufacturer requirements
- Clear all obstructions
- Confirm electrical and plumbing readiness
- Ensure safe access for installers
- Prepare fuel storage (biomass boilers)
- Ensure a responsible adult is present
After Installation
- Follow maintenance instructions
- Keep warranty documents safe
- Schedule regular servicing
- Report faults promptly